Piping – Thermal power plant with diathermic oil
Equipment connection piping. Specifications /
Equipment connection piping. Specifications /
Recovery boiler Sh + High pressure boiler + Eco + Low pressure boiler Specifications Sh : 36 bar / 430°C High pressure boiler : 36 bar / 250°C Eco : 40 bar / 250°C Low pressure boiler : 6 bar / 250°C